EN590 Diesel Tank Farm Storage
Ultra-low-sulphur diesel (ULSD) compliant with EN 590:2022. Available in B0 and B7 FAME blends. Suitable for all European climate classes.

At a Glance
≤10 ppm (ULSD)
Sulphur
≥51
Cetane Number
820–845 kg/m³
Density @15°C
≥55°C
Flash Point
Full Specification
Technical Parameters.
| Property | Value | Method / Standard |
|---|---|---|
| Standard | EN 590:2022 | — |
| Sulphur | ≤10 ppm (ULSD) | EN ISO 20846 |
| Cetane Number | ≥51 | EN ISO 5165 |
| Density @15°C | 820–845 kg/m³ | EN ISO 12185 |
| Flash Point | ≥55°C | EN ISO 2719 |
| CFPP | Class 0 to F (climate grade) | EN 116 |
| FAME content | ≤7% v/v (B7) or 0% (B0) | EN 14078 |
| UN Number | UN 1202 | — |
| Hazard Class | 3 | — |
| Packing Group | III | — |
Storage Specification
Typical Storage for Diesel EN590.
Floating-roof or internal-floating-roof tank
5,000–50,000 m³ per tank (typical industry range)
- Floating roof for vapour emission control
- Internal floating roof option for high-vapour-pressure blends
- Dedicated ULSD segregation — prevents cross-contamination
- Heated trace lines for winter-grade (CFPP) product
Discuss storage access and commercial terms for Diesel EN590.
Our Storage ServicesOrigins & Typical Uses
Supply Chain Context.
EN590 diesel is sourced from ARA-hub refineries and major European refinery groups. Rotterdam position allows rapid turnaround for road tanker, barge, and coaster delivery across the Northwest European market. Both B0 (biodiesel-free) and B7 (up to 7% FAME) blends are held in segregated tankage.
Typical End-Users
- 01Road transport operators and hauliers
- 02Agricultural machinery operators
- 03Industrial generators and standby power
Handling & Safety
Safe Custody.
UN Number
UN 1202
Hazard Class
3
Packing Group
III
Safety Data Sheet (SDS)
Full SDS per GHS / REACH regulation.
Quality Assurance
Every parcel of this product is independently inspected at the point of receipt and prior to discharge, conforming to our standard Product Inspection protocol. Representative samples are retained and tested by our on-site Laboratory against the applicable specification. Third-party surveyor access is available on request for custody-transfer parcels.

Make an Enquiry.
Our team replies within 24 hours. Tell us your volume, your product, and your timeline.